Terminal 2 Expansion

Airport Terminal
Aedas Ltd.

Design Team: Aedas Infrastructure Team

Hong Kong International Airport, Hong Kong
Gross Floor Area: 310,000 m²

Status: Under Construction

20190726_150310_BLUR.jpg

Consultant Team & Client

Consultant Team & Client

 

The Terminal 2 Expansion is located south of the existing Terminal 1, acting as the gateway into Hong Kong International Airport’s Three-Runway System expansion project. Featuring a large undulating roof & ceiling system in seven “feather” bays echoing Terminal 1’s vaulted design, passengers are processed through five levels, connecting to the future Third Runway Concourse via an extended Automated People Mover underground. Connecting Terminal 1 and 2 is a re-vamped Ground Transportation Center providing access to & from the City via MTR subway line and bus routes. Green features such as solar panels are installed on this roof and are visible during passenger drop-off.

rhino_revit workflow.jpg

While overseeing the development of the external envelope as the leader of his own team, Eric focused primarily on the geometrically complex Roof/ceiling package. Practically a building in itself, the Main Roof of the Terminal 2 not only included envelope design, but also maintenance/access design, MEP & structural coordination, lighting design, and fire engineering coordination.

An expert in both Rhinoceros and Revit, Eric has streamlined his workflow between the two industry-standard applications, effectively balancing design and documentation.

All rendered images courtesy of Aedas Ltd.

“The world as we have created it is a process of our thinking. It cannot be changed without changing our thinking.”

― Albert Einstein

 

 Learn more about Eric’s involvement in this project by contacting him to get an exclusive look Backstage.